We’re getting ready for lunch

I work at a fast food place in the area, plus it can get pretty hectic at times, especially during mealtimes. This past month was super busy around lunch. I never even had time to take our proper breaks each of these days! The Other day I had prep duty. It was our one assigned work to cut up all the veggies, plus to carefully prepare the sandwich meat for the dinner rush. This was not our preferred work at the place! It got even worse around 12 in the day when we had our lunch rush plus our heating plus cooling plan decided to split down. It was already a sweltering 99 degrees outside, plus now we were told we had to work entirely separate from any type of air conditioning. It was brutally moderate and humid separate from any type of air conditioner! What worked to make it worse was the heat from the grill and all those stovetop pans. It must have been 113 degrees in here separate from an a/c unit. I pleaded with our manager to call up a local heating plus cooling plan repair shop and get them on site now, although he did not have the time because of the current business rush, but he told myself and others he would call the heating plus cooling plan repair shop just after the rush died down. I couldn’t wait for that! I needed some a/c fast to stay sane. I know it would take awhile to get the a/c fixed and running again, however if it wasn’t fixed by tonight I wouldn’t be coming to work the next day. I cannot work at all in these conditions separate from any type of a/c to cool myself during this hard labor… Luckily, our manager was able to get a local HVAC plan repair shop on the shop phone shortly after the meal rush ended. The Heating plus cooling plan would be repaired by the following day.

local HVAC 

Leave a Reply

Your email address will not be published. Required fields are marked *