Prepping for lunch

I work at a fast food site which is very popular, plus it can get pretty hectic at times. This past week was super busy because we had a new store opening. I never even had time to take my respected breaks during that time! The Other afternoon I had brunch prep duty. It was my one major assigned work to split up all the raw veggies, plus prepare the sandwich meat for the impending brunch rush. This was not my favorite work but I got down to business! It got even worse around 11:30 in the afternoon when our heating plus cooling system abruptly decided to shut down. It was a sweltering 108 degrees outside, plus the whole crew now had to work without any type of air conditioning. It was brutally hot in the kitchen without any type of a/c! What made it so much worse was the heat from the grill. It must have been 120 degrees in here without an operable cooling system. I pleaded with my shift director to call up a local heating plus cooling system maintenance shop as soon as he could, but he did not have the time because of the brunch rush. So he told myself and others he would call the heating plus cooling system maintenance shop just as soon as he could after the brunch rush died down. I couldn’t wait, I needed some cooling system fast to make it through! I suppose it would take awhile to get the cooling system fixed and running at 100%, but if it wasn’t fixed by tonight I would certainly not be coming to work the next afternoon. I can’t work in these awful environmental conditions without any type of cooling system to cool myself and others down! Luckily, my director was able to get a local Heating plus A/C system maintenance shop right away on the iphone shortly after the brunch rush ended. The central Heating plus cooling system would be repaired by the following afternoon.

Leave a Reply

Your email address will not be published. Required fields are marked *